Construction ManagementAI construction management

Run every site from one record.

Schedule, progress, inspections, BOQ and documents, in one record.

Modules

Everything the site and the office run on.

Start with the schedule and daily progress, then add the modules your project needs. Bring the schedule from Primavera P6 or Excel and the BOQ from SAP.

People stay in charge.

  1. 01

    Nothing counts as progress until it is approved.

  2. 02

    Every approval needs evidence: photos from site.

  3. 03

    Every line of a progress statement links to its evidence.

Progress entries · 25 Sep
Site photo of the P3 rebar cage
✓ ApprovedRebar cage · pier P3

Logged from site with photos. The site engineer approved it at 14:31.

Site photo of the P4 pile cap
Needs a second lookPile cap · pier P4

A mixer truck blocks part of the photo. It waits for new photos and doesn't count yet.

Site photo of the top of pier P2
Not countedBearings · pier P2

The photos don't show the bearings, so nothing is claimed until they do.

Trail of result 1Photos 14:02ScheduleEngineer · 14:31BOQ 04.21
Execution and reporting

A day on site with AI construction management.

The Construction Management module keeps the schedule, daily progress and RFIs in one place, and engineers approve what is reported.

  1. An engineer logs progress on a phone.

    Photos from site attach to the entry, and the schedule updates.

  2. A question from site gets its answer.

    The question, the answer and the drawing stay in one thread.

  3. The engineer reviews the day's entries.

    Each entry has its photos attached. Approve it, fix the label or ask for new photos.

  4. The daily summary goes out.

    One email lists what progressed and what is waiting for review.

LivSYT AI and WhatsApp

Ask the project. Update it by chat.

  • LivSYT AI answers questions from live project data
  • Log quantities by typing or speaking
  • WhatsApp alerts for the team, and a WhatsApp assistant for site updates with tap-to-confirm buttons Pilot
Try it: ask a sample projectSample data

Pick a question. The answers come from the sample metro project in the sandbox.

Ask your own question in the sandbox
Reports

Reports from approved work.

  • The daily progress report builds from the day's logs and inspections
  • Dashboards for the project, quality and finance, with S-curves
  • A progress statement by BOQ line, each line linked to its clip and approval
  • A daily summary for the team on WhatsApp
FAQ

What site teams ask us.

Site

What is AI construction management?
The Construction Management module runs a site's schedule, daily progress, inspections, BOQ, RFIs and documents in one platform. LivSYT AI answers questions from live project data.
How do we get started?
Walk the site once with your planner to name the zones. The planner checks the zones before go-live. Start with a phone and a schedule.
Generative Design

Designing it too? The Generative Design module generates the structure from your engineering rules, analyses it in finite element and structural analysis tools and draws the drawings and a priced BOQ. Each module works on its own.

Explore Generative Design
Request a demo

Bring one zone of a live site.

Bring a phone and a schedule. We set up one zone, log a day's progress and open the reports. It takes 45 minutes.

The Generative Design and Construction Management modules make up LivSYT's AI construction cloud for infrastructure, made by Devin Tech Inc., Austin, Texas.

SOC 2 compliant

© 2026 Devin Tech Inc.