HomeConstruction Management

Construction ManagementCost, BOQ and billing

The BOQ, bills and change orders in one place.

Import the BOQ from SAP, follow quantity and value as the work is done, and manage client and vendor bills, payment schedules and change orders.

What it covers

Cost, BOQ and billing in Construction Management.

BOQ

Import the BOQ from SAP and follow quantity done against every line.

Bills and payment schedules

Client and vendor bills, each against its payment schedule.

Change orders

Record each change order, its value and its approvals.

Financial and physical progress

Value and quantity progress side by side, for every line and the whole contract.

Clients and vendors

The parties on each contract in one place, with their bills and payments.

Works withSAPTableau
Explainer

How a BOQ line moves with the work.

Try it

Log a quantity and watch the line move.

Quantity done, physical progress and the value of work done update together.

02.30 Rebar Fe500D, piers
Contract
1,150 t at ₹68,000 per t
Done
520 t
Physical
45%
Value of work done
₹3.54 crore

On a live project the quantity is logged against an activity, and its BOQ line follows.

Try a whole sample project
Ask LivSYT AI

Ask it to check the consumption.

Ask LivSYT AI whether material use matches the BOQ, and it answers from the quantities the site has logged.

Both modules

Designing it too?

Generative Design

The Generative Design module generates the structure from your engineering rules, analyses it in finite element and structural analysis tools and draws the drawings and a priced BOQ. Each module works on its own.

Explore Generative Design
Request a Demo

Bring one zone of a live site.

Bring a phone and a schedule. We set up one zone, log a day's progress and open the reports. It takes 45 minutes.

© 2026 Devin Tech Inc.