Keep the plan and the site on one schedule.
Bring the schedule from Primavera P6 or Excel. Teams log daily progress from site, and the daily progress report, the S-curves and the dashboards follow it.
| Activity | Status | Progress |
|---|---|---|
| Rebar cage, pier P3 | In progress | 60% |
| Pile cap concrete, P4 | In progress | 40% |
| Pile cap, P5 | Delayed | +6 days |
| Girders, span P1–P2 | In progress | 15% |
| Pour, pier P3 | Not started | – |
| Rebar cage, pier P4 | Not started | – |
Schedule and progress in Construction Management.
Activities and Gantt
Every activity with its dates, in a list, on a Gantt chart and on a master Gantt.
Daily progress
The site team logs progress on their phones every day, with photos and a daily journal.
Daily progress report
The day's report builds itself from what the site logged.
Delays and their reasons
See what slipped, by how much and the reason the site gave.
Work assignment
Assign each activity to a person and a crew, then follow it through.
S-curves and dashboards
Planned against actual, for the project and across the organisation.
How the schedule stays current.
Ask how the site is doing.
Ask LivSYT AI how far the work has got, and it answers from the progress the site has logged.
The rest of the platform.
Designing it too?
The Generative Design module generates the structure from your engineering rules, analyses it in finite element and structural analysis tools and draws the drawings and a priced BOQ. Each module works on its own.
Explore Generative DesignBring one zone of a live site.
Bring a phone and a schedule. We set up one zone, log a day's progress and open the reports. It takes 45 minutes.
© 2026 Devin Tech Inc.


